| Test Ride Pages | ||
|---|---|---|
| page 1 | page 2 | page 3 |
![]() | ![]() |
| after teresa dug out the trailer | and ed gave us a tour of the factory on the big wheel |
![]() | ![]() |
| we took the cycle apart and parked it at E&N Hoisting | then visited planet rock where peter patiently explained the safety gear |
![]() | ![]() |
| aristide setting up & leveling the saw horses while apo is prepping the parts | a look outside where ron and craig are setting up the cranes - it's snowing |
![]() | ![]() |
| apo assembling the standoff braces | josh connecting a cable |
![]() | ![]() |
| a lot of time is spent lining up the standoffs | roy tightening cables |
![]() | ![]() |
| the cranes are ready | low altitude safety gear test |
| Test Ride Pages | ||
|---|---|---|
| page 1 | page 2 | page 3 |